PORTAL REPOSITORY   

ARCHIVE
JOURNAL
SYSTEM

Pencarian

Lupa password?
Belum punya akun? Daftar disini!

 Universitas Serang Raya

 14 Items Record


Collection :


Jurnal Sistem dan Manajemen Industri


Items :


Terbit :  2017-12-31
Description : Corrective action on the engine damage is a temporary emergency measure, so further action is required by conducting maintenance activities, prevention of damage (Preventive maintenance), and able to detect abnormal symptoms before the machine breakdown occurs. The sudden impact of machine damage resulted in disruption of planned production performance so that it is necessary to identify and analyze the factors that cause the machine damage. Establish maintenance method using Autonomous Maintenance, Preventive Maintenance and Reliability Centered Maintenance (RCM) concept to prevent machine fa...

Terbit :  2017-07-31
Description : Quality control is an effort to increase customer satisfaction and minimize damage. Super Absorbent Polymer which is a product as a raw material for making baby diapers / elderly and sanitary napkins. In Super Absorbent Polymer, defects usually found in the colour contamination that there is a dark colour on the product, print labels mistakes and packaging defects. This study aims to determine the value of DPMO and sigma level, identify the efforts which is taken to reduce disability, identify the types of disability, and find the main factors causing disability. Six Sigma method is used to an...

Terbit :  2017-12-31
Description : Age and years of service are factors directly related to work productivity. Age and employment perceived by employees can decrease productivity or increase employee productivity. This research was conducted at PT. Oasis Water International Palembang Branch and aims to determine the influence of Age and Duration of employment on employee productivity. The number of sample is 27 respondents by using random sampling technique. Analysis method used is multiple linear regression method using SPSS aid which includes t test and F test. As independent variable (independent), that is age and work perio...

Terbit :  2017-08-05
Description : Supplier selection is being a strategic activity, especially when the supplier is supplying materials that will be used in the long term. In the world of construction, one part of the supply chain which has a significant contribution to the improvement of the company\'s effectiveness is the efficiency in the procurement of materials (raw materials) from suppliers. In the research found the problem of 50 TON of welded wire failed. This study aims to determine the criteria based on the company needs in determining the supplier of welding wire and provide the ranking of suppliers as a material co...

Terbit :  2017-08-05
Description : PT. INF is a steel mining company. It produce such as nickel pig iron. Nickel pig iron used raw materials stainless steel factory, nickel and steel mill rolls. The number of defective products for nickel pig iron in a few months getting on upward trend. This research will analyze the cause of the increasing defect product by using Six Sigma methode. Furthermore, the proposed improvement is done by using the failure mode and effect analysis (FMEA) approach. The results shows the main problems are the higher value of Silica (Si) and phospor (P), the sigma level is obtained from the annual pig ir...

Terbit :  2017-12-31
Description : Public satisfaction can be achieved if the government apparatus directly involved in the service, can understand and appreciate and wish to perform excellent service. This study aims to identify the level of public satisfaction with the performance of Members of the House of Representatives Commission III, to determine the priority of expectations or public desires on the quality of service absorption aspirations of members of Parliament with Servqual method and improve the quality of absorption services by QFD method. This study, using questionnaires, interviews, and observations in data coll...

Terbit :  2017-08-05
Description : PT. XYZ is a manufacturing company that produces the constituent components of HDD (Hard Disk Drive) products. One of the products produced by PT. XYZ made from rubber. The product has a strict specification, both for the accuracy of size and for display. One of the problems faced by PT. XYZ is the output of a 100% unstable check section even though the amount of human resources used is the same every day. There is a variation of the output / clock / operator from 650 to 714.4 pieces. This study aims to analyze the cause of the variation of output / hour / operator and to find solutions to min...

Terbit :  2017-08-05
Description : The main factor to achieve business success in the era of globalization is quality. Quality control is key in maintaining customer loyalty. In the company\'s production process is still found the resulting product does not comply with the specified specifications. This study aims to determine the value of sigma and factors causing damage to the production process of bagging section For companies with quality control is expected to achieve corporate goals. In this study, the methods used is Six Sigma with define, measure, analyze, improve. Six Sigma result is measurement of company performance...

Terbit :  2017-12-31
Description : At this time Krebo Jantan Restaurant has plans to conduct business development in the field of food. Krebo Jantan Restaurant has a problem as to whether its business development plan can provide feasibility for future growth of the company. The purpose of this study is to determine the possibility of the business plan for the development of food business with the limits of research on the assessment of financial aspects. Primary data collection is done through field observation, interview and questionnaire filling. Objects in interviews and surveys are business owners and residents around the...

Terbit :  2017-08-05
Description : CV. ABP a construction company worked in infrastructure building development for private and goverment. Now CV. ABP is handling infrastructure development project of the acropolitan area (Right Payment) Sukaci - Baros Village. This project has been late for 19 days from the dead line 126 days. Therefore the cost is getting higher. It’s happened because bad management is the problem source. Restoring the project time need to be focused on the cost and the due date based on the schedule. Scheduling evaluation using Critical Path Method (CPM) and Crashing to find optimal results using Critical Pa...